Monarch Fire Protection District
Design and Construction for New Fire Station Houses 2 and 3
Wildwood, MO and Chesterfield, MO
Faith Group collaborated with the District and architect to design and construct two new fire stations. Fire House #2 (Wildwood) and Fire House #3 (St. Louis County) will be approximately 13,000 sf. each and include new site and utilities. The new firehouses replaced existing facilities that were built in the 1970’s. Faith Group provided engineering and design for all low voltage systems including telecommunications, IT network, security, audiovisual, and radio. Due to scheduling constraints by the client, our team had to simultaneously design both facilities on an accelerated schedule.