Pinckneyville Hospital
Domestic Hot Water Study
Pinckneyville, IL
The hospital was experiencing issues with the domestic hot water circulation and the time it takes to obtain hot water at the sinks and showers. Faith Group was tasked with reviewing the existing domestic hot water system and providing recommendations and cost opinion to correct the issue. Staff participated in meetings with the project team, reviewed existing as-built drawings, performed a site survey to review existing conditions of the hot water system, and developed a Study Report that included an overview of existing systems, conditions, recommendations, and estimated costs to resolve the issues.